-
Power grid is our traditional business . Relying on the excellent resource integration and financing capacity of transmission line projects, the company is able to provide turnkey solution including research, survey, design, supply, construction, installation, commissioning, operation, maintenance and training of ultra-high voltage and high-voltage transmission lines.We have completed the power transmission line projects in Pakistan, Nigeria, Ghana, Mauritania, Kenya, Tanzania, Uganda, Rwanda, Thailand and Bangladesh etc.
-
280km 500 kV Transmission Line Project in Pakistan
-
-
-
Pakistan President and China President attend Signing Ceremony of Sinotec MG-1 500kV Transmission Line Contract
NIPP LOT15 330kV Transmission Line and 132kV Transmission Line Project in Nigeria,Nigeria Vice President attended Acceptance Ceremony of Sinotec Transmission Project
676km 225kV Transmission Line Project in Mauritania,Mauritania President attended Corner Stone Laying Ceremony of Sinotec Projects
-
230kV Double-Circuit Transmission Line Project in Thailand
-
132kV Double-Circuit Transmission Line Project in Bangladesh
-
Transmission
PUBDATE:2019-12-23
- PREV:Distribution
- NEXT:Substation